Summary of Typical Cx Activities & Phases



Pre-Design arrow
  • Activities to make Cx integral Part of the project
  • Establish scope, probable costs and time requirements
 
Design arrow
  • Preparation of Cx plan based on final design information
  • Develop Systems Verification Checklist (SVC) and Functional Performance Tests (FPT)
 
Construction arrow
  • Cx plan implementation, interaction between construction team, Commissioning Authority and Design team
  • Coordination, Resolution Tracking, Observe Installation, BAS point verification, T&B, SVCs, and documentation
 
Acceptance /
Post Acceptance
arrow
  • Carry out FPTs, O&M staff training
  • Warranty
  • Carry out "off Season" tests, update documentation